The automations list: failures and the spending limit per run

How to read each row in Automations, what each failure reason means and how the spending limit per run works.

3 min read·Updated Oct 2026
Sign in and open: Open Automations
Illustrative example

A row

  • The apps the automation uses — up to three logos, and “+N” when there are more
  • The name and the schedule in words, with the next run
  • The last 7 runs as dots, with a written summary: how many were ok, how many failed, how many were skipped
  • When something is wrong, a third line gives the reason and the way out

The colors

No color, no word

The automation is running fine.

Red

The last run failed.

Amber

Skipped for lack of balance, or stopped at the spending limit. Not a fault in the automation.

The failure reasons

On screenWhat to do
Skipped, no balanceThe balance did not cover the expected cost. It runs again when there are credits; the owner decides on buying
Stopped at the spending limitThe run went over the spending limit per run. Check what it did and, if that is normal, use Adjust the limit
{app} disconnectedAn app the automation uses went down. Use Reconnect; it runs again at the next scheduled time
The {key} key is no longer acceptedA key saved in Secrets was refused. Replace its value in Secrets
It ran, but could not deliverThe notice, email or calendar event did not go out. Open the run to see where it stopped
Prophet errorA failure on our side talking to the model. It usually clears on the next run
Timed outThe run took too long — an automation run stops at 30 minutes. Split the request or make the instruction more direct
The Worker did not finishThe Worker stopped without finishing. Open the run’s conversation to see why
Reason not identifiedOpen the run and, if it is still unclear, use Ask for help

The automation panel

Click the row to open the panel: What happened (the reason and the way out), What it does, Last runs — each opens the conversation with what Prophet did — and Schedule. What happened also holds Ask for help, which opens a ticket about that automation.

Spending limit per run

It lives under Schedule, in the automation panel:

Automatic

The default. Prophet works out the limit from the cost of that automation’s last completed runs; with no history, it uses a starting value.

A number of your own

Write how many credits a run may spend. Clearing the number goes back to automatic.

The plan ceiling

Applies on top of any limit. If you write more than the plan allows, the panel tells you which limit is in effect.

In a team

An automation’s limit can only be changed by whoever created it. Actions that involve money — buying credits, adjusting the limit — do not show for team members; the owner is notified.

Was this helpful?